Construction & Remodeling

The Facilities Management department of New Mexico Tech is responsible for many construction

Leo

Leo Guerra, Construction Manager

projects on campus. This page is made available to show the progress of these projects, including the current status of each project and other important information.

The information presented here is updated on a regular basis, but may not be 100% current at the time it is viewed. For current status of an individual project, contact the New Mexico Tech Facilities Management office at 505-835-5533.

 

  

 

 

 

 

 

Completed in Current Year

 Civil Engineering building

 Fidel Center: third floor and landscaping on east side
 
Jones Annex: slab stabilization
 
Campus directional sign at Leroy Place and School of Mines Road
 
Gym offices remodel
 
NRAO storage building
 
Mini-Baja metal building
 
Fine Arts drainage improvement
 
Natural gas system upgrade along Canyon Road
 
Trees throughout Campus: assessment, removal, and replacement
 
Swim Center: exhauster installed
 
EMRTC garage and carpenter shop: electrical upgrade
 
Cooling upgrades:
            Cramer
            Speare
            Golf Shop grill
            R&ED machine shop
 

 (List last updated on 5/13/2009)

 

NM Tech Facilities Management

 Policy for Alterations and Renovations of Buildings

 All alterations and or renovations of Institute Buildings MUST comply with the following to ensure project coordination and review, code compliances and safety.

For purposes of this policy, alteration and renovation are defined as any work that modifies the permanently constructed facility. This includes adding, replacing or relocating doors, walls or windows, altering or penetrating corridors or ceiling, adding on to or dividing existing space, or work on any building utility system including electrical, plumbing, ventilation, fire alarms, and fire sprinklers.
  1. Work in Institute buildings may not be performed by departmental staff, students or volunteers without prior written approval from the Director of Facilities Management. This will only be approved for very simple projects that can be completed safely with minimum risk of injury.
  2. All work in Institute buildings will be coordinated by the Facilities Management Department.
  3. Contractor services must be arranged through applicable Institute procurement and contracting    channels, regardless of the funding source for the work. All work of this nature will be routed through Facilities Management. Depending on the Facilities Management staff’s work load, a determination will be made to do it in house or contract out the service.
  4. When Facilities Management receives requests for renovation work, they will make sure all construction permits and Fire Marshal permits are in place prior to the start of work. 

 These procedures are necessary to ensure health and safety and the appropriate coordination of building systems. Projects started without proper review could have the following problems:

  • Workers could unknowingly disturb asbestos material, creating a hazard for building occupants.
  • Completed projects may have to be dismantled when discovered because of Fire Marshal violations.
  • Unqualified electrical work could result in breaker overloads and shock hazards to building occupants.
  • Changes to building ventilation systems could cause the heating and cooling to work improperly.
  • Any work done outside of code could make the modification to a building unsafe to the occupants.
These policies are effective immediately, and shall remain in effect, without exception. Non-approved projects that are initiated in violation of this policy will be corrected if necessary by Facilities Management, with all associated costs charged to the responsible unit.  

 

Please direct any questions or concerns about the content of the Facilities Management's website to facmgmt@admin.nmt.edu

Tech Community Mourns The Loss Of A Student

Tech Community Mourns The Loss Of A Student

SOCORRO, N.M. May 5, 2015 – The New Mexico Tech community is grieving the loss of a student over the weekend. Bryce McKenzie, a senior in the Physics Department, died late Friday night or Saturday m...

Bureau Of Geology Sets Grand Opening For Friday

Bureau Of Geology Sets Grand Opening For Friday

SOCORRO, N.M. May 5, 2015 – The campus community is invited to a ceremonial ribbon-cutting and grand opening of the new Bureau of Geology and Mineral Resources building, known as the Chuck and Jessi...

All Are Invited To Commencement 2015

All Are Invited To Commencement 2015

SOCORRO, N.M. May 4, 2015 – Everyone is welcome to attend the 2015 Commencement ceremony, which will begin at 9 a.m. Saturday on the lawn between Brown Hall and the Library. Tech expects about 260 ...

Mine Safety Conference Sets The Standard

Mine Safety Conference Sets The Standard

SOCORRO, N.M. May 1, 2015 – When it comes to safety, YOU set the standard. That’s the message of the 8th Annual New Mexico Mine Health and Safety Conference, taking place May 4 to 6 at New Mexico Te...

Spring Arts Show and Sale

Spring Arts Show and Sale

SOCORRO, N.M. April 27, 2015 – The Community Education Department is hosting its annual spring Art Show and Sale on Wednesday, April 29, with a smattering of new offerings.    ...

Frontpage Slideshow | Copyright © 2006-2011 JoomlaWorks Ltd.